Skip to content

Architecture—05 / 24

Manhattan Mangalore

Mangalore, India/Residential high-rise/2024 — Current/FACE Architecture + Design

Three basements, ground and forty floors — a tower whose plan was tuned for vertical circulation, views and the sequence from street to front door.

01Planted balconies carry a garden edge up the tower, floor by floor.
Location
Mangalore, India
Year
2024 — Current
Sector
Residential
Scope
RIBA Stages 0–3 — concept to spatial coordination
Status
Technical Design Phase

My contribution

My role
Senior Architect
Responsibility
RIBA Stages 0–3 — concept to spatial coordination

Key contributions

  • Worked through RIBA Stages 0–3 with the Design Director
  • Oversaw junior architects on planning logic and Revit outputs
  • Optimised unit layouts
  • Defined the resident experience
  • Coordinated structure, MEP, vertical transportation and lighting
  • Set initial material and FF&E intent

The project

In a tower, efficient planning shapes the everyday experience of coming home. A clear route from arrival to apartment, coordinated services and well-placed shared spaces make that efficiency tangible to residents. Unit layouts were optimised for vertical circulation, views and local regulations, while the resident experience — entry sequence, lobby composition, lift-core flow, amenities — was designed as one continuous route.

Structural, MEP, vertical transportation and lighting consultants were coordinated to resolve shaft alignments, service zones and façade-structure integration before the technical phase.

02Shared life anchors both ends of the tower: podium amenities connect residents near the street, while the cinema, lounge and terraces gather them at the crown.
03The podium gives the tall building a lower, more approachable address at street level.
04A deep gateway makes arrival a sequence, with a pause before the lobby.
05Each balcony adds a layer of planting between the home and the wider city.
06Staggered terraces loosen the upper floors before the building reaches its shared amenity crown.

“Optimising the plan around the experience of coming home.”

07The upper setbacks make room for larger outdoor spaces within the tower's narrow outline.
08The rooftop pavilion completes the residents' amenities, with cinema and lounge spaces at the top of the building.
09A compact footprint concentrates the homes vertically while retaining a planted arrival at ground level.
10Continuous balcony bands connect the tower's changing floor plates into a recognisable whole.

Process

Site & context

The site within the surrounding street network, buildings and greenery.

Indicative context section A–A′ through the marked site and surrounding roads.
Exploded context layers
Terrain, roads, greenery and buildings separated into the layers that form the site's context.
  1. Terrain
  2. Road network
  3. Greenery
  4. Buildings
  5. Combined context
Warmth & humidity
The report indicates warm, humid conditions through the year.
Wind
The report indicates predominantly westerly winds.
Rainfall
Rainfall is strongly seasonal, with the report showing a July peak.

Context mapping and indicative analysis from archiMap. Terrain, noise and congestion outputs are not presented as surveyed or field-verified measurements. Climate notes from the archiMap environmental report, exported 25 October 2026.

  • DWG 01Two homes share one core, with living spaces drawn towards the planted edge.

  • DWG 02A balcony that bends with the rooms gives each home more than a single outlook.

  • DWG 03The garden follows the perimeter, extending the domestic plan beyond its walls.

  • DWG 04The typical floor becomes a rhythm, repeated between the shared podium and the crown.

Colophon

Location
Mangalore, India
Year
2024 — Current
Sector
Residential
Typology
Residential high-rise
Scope
RIBA Stages 0–3 — concept to spatial coordination
Status
Technical Design Phase
Role
Senior Architect
Client
Mohtisham Development
Storeys
3 B + G + 40 Floors
Software
AutoCAD, Revit, Adobe CC